Local
LA’s best kept secret for flying just got better. Inside Burbank’s new terminal
Summary by The Los Angeles Editorial Desk · Byline on the source page: Cato Hernández , as published by LAist (KPCC / Southern California Public Radio)
· October 6, 2026
· 1 min read
Photo: LAist (KPCC / Southern California Public Radio) · view original
Story provenance No corrections
Summary created by The Los Angeles Editorial Desk — automated, rule-governed Byline on source page Cato Hernández, as published by LAist (KPCC / Southern California Public Radio) Original story Read at the source Source published Oct 6, 2026 Indexed here Oct 6, 2026 AI assistance Automated summary drawn from the source’s own published text Prepublication human review No — editorial rules, flagged-item review, and published samples
Every story comes with a passport. How we work · Corrections log
Key points The project was made possible by Measure B, which was passed by voters in 2016. It is set to open to the public on October 13.
A new terminal building has been completed at Hollywood Burbank Airport. The project, known as Elevate BUR, was finished on time and on budget. It is set to open to the public on October 13. The $1.3 billion terminal will replace the existing one, which opened in 1930 and will eventually be demolished.
The old terminal is not up to code and is too close to the airstrip. A new entrance will be located at Winona Avenue and Hollywood Way. The project was made possible by Measure B, which was passed by voters in 2016.
Further details about the new terminal are available, including a sneak peek inside the building.
More Local Today’s briefing Local events
Why this story is here
LAist (KPCC / Southern California Public Radio) reported and published this story. The Los Angeles selected it, summarised the key facts above, and links to the original. We did not report this story and we added no reporting of our own to it.
About this story
As published by LAist (KPCC / Southern California Public Radio) . The Los Angeles selects stories from publishers’ feeds, summarises them, and links back to the publisher that reported them. We add no reporting of our own. We attribute every source, link to the original report, and follow a documented editorial standards policy. To understand how stories are selected and reviewed, read our about page .
For the complete original report, visit LAist (KPCC / Southern California Public Radio) . Have a tip or correction? Contact the editor .
Category: Local ·
Published: October 6, 2026 ·
Source: LAist (KPCC / Southern California Public Radio) ·
Reading time: 1 min
Frequently asked about this story
What is this story about? A new terminal building has been completed at Hollywood Burbank Airport. The project, known as Elevate BUR, was finished on time and on budget. It is set to open to the public on October 13. The $1.3…
When was this published? This article was first published on October 6, 2026 by LAist (KPCC / Southern California Public Radio) and curated for The Los Angeles readers.
Who reported this story? This story was reported by Cato Hernández at LAist (KPCC / Southern California Public Radio). To learn more about how The Los Angeles selects and reviews stories, see our editorial standards .
Where can I find related coverage? See more Local coverage from The Los Angeles, or browse our daily briefing and topic hubs .
← Back to all news
More Local →
Today’s briefing
Subscribe to newsletter